Max Estates seeks shareholder approval for three related party transactions with MENL2 for Project 132: EMD reimbursement, CCD investment and a loan
AGM/EGMPostal Ballot
Max Estates seeks shareholder approval for three related party transactions with MENL2 for Project 132: EMD reimbursement, CCD investment and a loan
Proposed related party transactions with MENL2 for Project 132
- Max Estates Limited proposes three related party transactions with its subsidiary Max Estates Noida Two Limited (MENL2) in relation to Project 132: (i) reimbursement to Max Estates of an earnest money deposit of ₹41.07 crore, (ii) investment by Max Estates in compulsorily convertible debentures (CCDs) of MENL2 aggregating ₹150 crore (approx.), and (iii) a loan from Max Estates to MENL2 aggregating ₹200 crore (approx.).
- All three proposed transactions exceed the materiality threshold of 10% of the company’s annual consolidated turnover and require prior Members’ approval under Regulation 23 of the Listing Regulations.
- Post equity issuance to the consortium members, MENL2 will cease to be a wholly owned subsidiary of Max Estates and will become a Special Purpose Company (SPC) in which Max Estates will hold 70%, with Max Towers Private Limited (MTPL) holding 10% and Max Ventures Investment Holdings Private Limited (MVIHPL) holding 20%.
- The CCDs will be issued to MENL2 at ₹10 per CCD with a 1:1 conversion into equity shares, subject to conditions; CCDs carry a coupon of approximately 10% per annum (1.15% over SBI MCLR of 8.85%) and have a tenure of up to eight years from first allotment, with mandatory conversion upon the earlier of eight years or occupancy certificate.
- The proposed loan to MENL2 is unsecured, up to ₹200 crore, with interest at approximately 10% per annum (1.15% over SBI MCLR) and a tenor of eight years from the first disbursement or occupancy certificate, whichever is earlier, to be disbursed in one or more tranches.
- The EMD amount of ₹41.07 crore would be recognised as a receivable by Max Estates and reimbursed by MENL2 after shareholder approval, with timing to be determined by MENL2’s Board.
Company UpdatePress Release / Media Release
Premier Energies to acquire 10% stake in RCT Space GmbH and form space solar collaboration
Company UpdatePress Release / Media Release
Premier Energies to acquire 10% stake in RCT Space GmbH and form space solar collaboration
Strategic investment and space-solar collaboration
- Premier Energies to acquire a 10% equity stake in RCT Space GmbH, Germany, via a mix of primary and secondary transactions, and enter a technology partnership.
- A dedicated Indian R&D centre for space solar will be established, leveraging RCT Space's patented technologies.
- The partnership positions Premier Energies as one of the first Indian solar manufacturers to enter the space solar segment.
Capacity, capex and capability drive
- Cell manufacturing capacity: 10.6 GW.
- Module manufacturing capacity: 11.1 GW.
- Capex programme of ₹12,500 crore to strengthen manufacturing, expand backward integration into ingots and wafers, and diversify into transformers and battery energy storage systems.
Company UpdateUpdates - Corporate Insolvency Resolution Process (CIRP)
Gujarat Toolroom CoC approves replacing IRP, appoints Rajesh Jasti as RP; NCLT approval pending
Company UpdateUpdates - Corporate Insolvency Resolution Process (CIRP)
Gujarat Toolroom CoC approves replacing IRP, appoints Rajesh Jasti as RP; NCLT approval pending
Main disclosure and status
- An Interlocutory Application has been filed before the National Company Law Tribunal, Ahmedabad Bench, seeking replacement of Interim Resolution Professional Iqbal Singh Gandhi with Rajesh Jasti as the Resolution Professional of Gujarat Toolroom Limited (In CIRP).
- The application is under Section 22 and 60(5) of the Insolvency and Bankruptcy Code, 2016, with the Committee of Creditors' decision to replace the IRP attached to the IA; appointment of the RP is subject to eligibility and confirmation by the Hon'ble NCLT.
Committee of Creditors proceedings and creditor composition
- First CoC meeting held on 30.10.2026; creditors include Naksh Steel Limited (60.54% voting share), Kamlesh Trading (18.03%) and Shuchi Textile FZC (21.43%).
- Second CoC meeting held on 14.11.2026; the CoC unanimously approved replacement of the IRP and appointment of Rajesh Jasti as RP via postal ballot, with 100% voting share.
- CoC also discussed appointment of registered valuers (two appointed on 13.11.2026) and the consideration of a forensic audit; in-principle approvals were recorded, to be formalised later.
- CoC approved reducing the notice period for CoC notices from 5 days to 48 hours and extending the interval between CoC meetings.
Company UpdateAward of Order / Receipt of Order
ONGC awards two 3-year rig deployments to Jindal Drilling at ED Rates of Rs 52,50,596.07 and Rs 51,99,165.41
Company UpdateAward of Order / Receipt of Order
ONGC awards two 3-year rig deployments to Jindal Drilling at ED Rates of Rs 52,50,596.07 and Rs 51,99,165.41
ONGC awards for deployment of two rigs
- ONGC issued two notifications of award for deployment of Rig Jindal Star and Rig Virtue-I for 3 years each at ED rates of Rs. 52,50,596.07 (USD 55,172.45) and Rs 51,99,165.41 (USD 54,632.02) respectively.
- Awards are domestic; execution period is 3 years.
- Promoter/group interests: none reported; related-party transactions: not applicable.
Shivam Autotech Limited
Company UpdateGeneral
Shivam Autotech completes rights-issue allotment of 9,48,75,201 equity shares at ₹12 each, raising paid-up capital to ₹45,27,40,840
Company UpdateGeneral
Shivam Autotech completes rights-issue allotment of 9,48,75,201 equity shares at ₹12 each, raising paid-up capital to ₹45,27,40,840
Rights-issue allotment details
- Type of securities: Equity shares of ₹2 face value.
- Issuance: Rights issue to eligible equity shareholders as on record date 15 October 2026.
- Allotment size and price: 9,48,75,201 equity shares allotted at ₹12 per share (₹2 face value + ₹10 premium).
- Board approval: Allotment approved by the Board on 28 November 2026.
- Record date: Eligible shareholders identified as on 15 October 2026.
- Resulting capital: Post-allotment paid-up equity share capital stands at ₹45,27,40,840 comprising 22,63,70,420 fully paid-up shares.
Company UpdateAcquisition
Race Eco Chain approves Rs 7,75,25,000 CCPS allotment in Ganesha Recycling Chain Private Limited; parent stake remains 51%
Company UpdateAcquisition
Race Eco Chain approves Rs 7,75,25,000 CCPS allotment in Ganesha Recycling Chain Private Limited; parent stake remains 51%
Investment in subsidiary and CCPS allotment
- Board of M/s Ganesha Recycling Chain Private Limited, a material subsidiary of Race Eco Chain Ltd, approved on 28 November 2026 the allotment of 1,55,050 0.01% CCPS of face value Rs 10 each to Race Eco Chain Ltd for aggregate consideration Rs 7,75,25,000.
- Post allotment, the equity stake in the subsidiary remains 51% in Race Eco Chain Ltd.
CCPS terms and consideration
- Instrument: 0.01% Compulsorily Convertible Cumulative Preference Shares (CCPS) of Rs 10 each.
- Total number of CCPS allotted: 1,55,050; aggregate consideration: Rs 7,75,25,000.
- Mode of payment: Cash.
Ownership, control and governance impact
- Percentage of shareholding / control acquired: 51% Equity shares of Ganesha Recycling Chain Private Limited.
Company UpdateAnalyst / Investor Meet
SRIT posts Q2 FY27 revenue ₹1,047m; H1 ₹1,925.1m, IPO funds growth and AI bets
Company UpdateAnalyst / Investor Meet
SRIT posts Q2 FY27 revenue ₹1,047m; H1 ₹1,925.1m, IPO funds growth and AI bets
Financial performance highlights for Q2 FY27 and H1 FY27
- Consolidated revenue from operations for Q2 FY27: ₹1,047 million; sequentially up 19.2% from ₹878.1 million in Q1 FY27; YoY ₹1,047 million versus ₹811.8 million in Q2 FY26 (≈29%).
- H1 FY27 revenue: ₹1,925.1 million.
- PBT for Q2 FY27: ₹188.9 million; PAT: ₹137.4 million; sequential improvement from Q1; H1 PAT: ₹205.5 million, up ≈17.2% YoY to ₹175.3 million.
- EPS for H1 FY27: ₹4.33; vs ₹3.98 in H1 FY26.
- Cash and cash equivalents: ₹1,084.9 million as of 30 Sept 2026; total equity: ₹2,798.2 million; operating cash flow: ₹865.3 million in H1 FY27 vs outflow ₹190.4 million in H1 FY26.
Business mix, operating metrics and AI-driven initiatives
- H1 FY27 revenue by vertical: Electronic Governance ₹1,161.02 million (60.3%), Telecoms & Broadband Management ₹582.13 million (30.2%), Healthcare ₹181.96 million (9.5%).
Company UpdateCorporate Insolvency Resolution Process
Future Consumer's Committee of Creditors to hold fourth meeting on 30 November 2026
Company UpdateCorporate Insolvency Resolution Process
Future Consumer's Committee of Creditors to hold fourth meeting on 30 November 2026
Intended meeting and regulatory basis
- Future Consumer Limited informs stock exchanges that the fourth meeting of its Committee of Creditors is scheduled for Monday, 30 November 2026, pursuant to Regulation 30 of the SEBI Listing Obligations and Disclosure Requirements Regulations, 2015.
- The communication references sub-clause 16(g) of Clause A of Part A of Schedule III of LODR.
Resolution professional and authorization
- Aegis Resolution Services Private Limited, through authorized signatory Avil Menezes, acts as the Resolution Professional of Future Consumer Limited.
- Registration No. IBBI/IPE-0118/IPA-1/2022-23/50041; authorization for assignment valid till 30 June 2027.
Recipient and filing context
- The letter is addressed to the Department of Corporate Services, BSE Limited, and NSE India Limited, informing the fourth CoC meeting and providing listing-department records for scrip codes 533400 (BSE) and FCONSUMER (NSE).
Date and sign-off
- Dated 26 November 2026; sign-off by Avil Menezes on behalf of Aegis Resolution Services Private Limited.
Company UpdateAward of Order / Receipt of Order
Valplast settles arbitration; ₹5 crore payable within 60 days under Consent Award dated 28 November 2026
Company UpdateAward of Order / Receipt of Order
Valplast settles arbitration; ₹5 crore payable within 60 days under Consent Award dated 28 November 2026
Arbitration settlement and Consent Award
- The arbitration between Valplast Technologies Limited and Gammon Engineers and Contractors Private Limited has been amicably settled; Consent Award dated 28 November 2026 passed under Section 30(2) of the Arbitration and Conciliation Act, 1996, and the proceedings disposed.
- Under the terms, the Respondent shall pay ₹5,00,00,000 to the Claimant within 60 days from the Execution Date, via electronic bank transfer.
- In case of default, the Respondent shall pay interest at 12% per annum on the unpaid amount until actual payment.
- Annexure 1 confirms the dispute related to the Termination and Release Agreement (19.12.2013) concerning the Mangdechhu Hydroelectric Project in Bhutan, with Valplast entitled to receive ₹5 crore.
Company UpdateAcquisition
Capri Global Capital approves ₹200 crore rights-issue investment in CGHFL; completion by 31 March 2027
Company UpdateAcquisition
Capri Global Capital approves ₹200 crore rights-issue investment in CGHFL; completion by 31 March 2027
Board approves investment in CGHFL via rights issue
- Board of Directors of Capri Global Capital Limited, November 28, 2026, approved a further investment of ₹200 Crore in Capri Global Housing Finance Limited (CGHFL) by subscribing to equity shares to be offered by CGHFL on a rights basis.
- CGHFL is a wholly owned subsidiary of the Company, and the investment would not change the Company’s 100% ownership in CGHFL.
Disclosure and regulatory context
- Disclosures are enclosed as Revised Annexure A pursuant to Regulation 30 read with Schedule III and Regulation 51 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015.
- The revised Annexure A supersedes the earlier intimation regarding the timeline and confirms that other disclosures remain unchanged.
Related-party, arm's-length basis and approvals
- The acquisition falls within related party transactions since CGHFL is a wholly owned subsidiary; promoters have an interest in CGHFL.
- The transaction is intended to be undertaken on an arm's length basis, supported by an independent valuation report.
Company UpdateAcquisition
SWELECT approves up to Rs 9,27,22,998 investment to raise GNU Solar stake to 73.85%
Company UpdateAcquisition
SWELECT approves up to Rs 9,27,22,998 investment to raise GNU Solar stake to 73.85%
Lead disclosure and key terms
- Investment Committee approved an additional investment in GNU Solar Assetco Two Private Limited (Wholly Owned Subsidiary) of up to Rs 9,27,22,998, by subscription to equity shares, including conversion of the existing loan into equity, towards setting up up to 11 MWp DC solar plant under the Group Captive Scheme at Kerala.
- Post allotment to GNU Solar and other group captive investors, SWELECT Energy Systems Limited will see its status change from Wholly Owned Subsidiary to a subsidiary with 73.85% equity stake in GNU Solar Assetco Two Private Limited.
- The investment is cash-based, including conversion of existing loan into equity shares; price per share is Rs 17 (face value Rs 1; premium Rs 16) and up to 54,54,294 equity shares may be subscribed.
Related-party, arm’s-length basis and governance
- The transaction is disclosed as a related party transaction under SEBI LODR Regulations; the proposed deal is stated to be at arm's length.
GNU Solar Assetco Two Private Limited – background
- GNU Solar Assetco Two Private Limited was incorporated on 15 June 2026, with paid-up equity share capital of Rs 10,00,000 and has not yet commenced commercial production.
- Latest financial parameters: turnover Nil; PAT Nil; net worth Rs 0.10 crore.
Company UpdateInvestor Presentation
Veerhealth Care Ltd reports FY27 revenue of 22.35 Cr with EBITDA 2.05 Cr and PAT 1.21 Cr; balance sheet shows assets of 44.17 Cr as FY25-26 and US FDA milestone updates
Company UpdateInvestor Presentation
Veerhealth Care Ltd reports FY27 revenue of 22.35 Cr with EBITDA 2.05 Cr and PAT 1.21 Cr; balance sheet shows assets of 44.17 Cr as FY25-26 and US FDA milestone updates
Current-year financial highlights (FY 27)
- Revenue from Operations: 22.35 Crores
- Total Income: 22.54 Crores
- EBITDA: 2.05 Crores
- PBT: 1.44 Crores
- PAT: 1.21 Crores
- Total Comprehensive Income: 1.21 Crores
Company UpdateInvestor Presentation
Subex Q2 FY27: Revenue up 24.2% YoY; 20.8% Normalised EBITDA margin; six quarters of positive PAT
Company UpdateInvestor Presentation
Subex Q2 FY27: Revenue up 24.2% YoY; 20.8% Normalised EBITDA margin; six quarters of positive PAT
Q2 FY27 financial highlights
- Revenue up 24.2% YoY in Q2 FY27.
- Normalised EBITDA margin of 20.8% in Q2 FY27.
- Six consecutive quarters of positive PAT from Q1 FY26 to Q2 FY27.
Operational metrics and scale
- 92% customer retention.
- Approximately 70% recurring revenue.
- 150+ installations across 100+ countries.
Board Meeting
Divyashakti Board to consider equity fund-raising and export receivables capitalisation on 3 December 2026
Board Meeting
Divyashakti Board to consider equity fund-raising and export receivables capitalisation on 3 December 2026
Board meeting agenda and key proposals
- Board meeting of Divyashakti Limited (formerly Divyashakti Granites Ltd) is scheduled for 3 December 2026 at 11:30 A.M. IST through Audio-Visual Means, with the deemed venue at the Registered Office.
- The meeting is convened under Regulation 29(1)(d) of the SEBI Listing Obligations and Disclosure Requirements Regulations, 2015, and other applicable provisions.
- To consider and approve the proposal for raising funds through issuance of equity shares through one or more public or private placement offerings, subject to shareholders' approvals and applicable regulatory requirements.
- To consider and approve the detailed proposal for capitalisation of outstanding export receivables from Cosmos Granite (South East) LLC and Cosmos Granite (West) LLC, USA, pursuant to earlier in-principle approval, including the consideration, membership interests and transaction documents, subject to requisite shareholders’ approvals.
- To consider and approve the Postal Ballot Notice and explanatory statement for seeking members’ approval for the proposed capitalisation of export receivables as a material related-party transaction, together with the associated arrangements.
- Any other business with the permission of the Chair.
Yes Bank Limited
Company UpdateCredit Rating
S&P assigns RXG bank ratings to Yes Bank; long-term BB+rxg, short-term Brxg (outlook not applicable)
Company UpdateCredit Rating
S&P assigns RXG bank ratings to Yes Bank; long-term BB+rxg, short-term Brxg (outlook not applicable)
S&P bank ratings assigned to YES BANK Limited
- Rating agency: S&P Global Ratings
- Rating category: Bank Rating Excluding Government Support (RXG)
- Long-term rating: BB+rxg
- Short-term rating: Brxg
- Rating action: New ratings assigned
- Outlook: Not applicable – RXGs do not have an outlook
Company UpdateCredit Rating
S&P Global Ratings assigns RXG bank rating to Yes Bank Ltd; BB+rxg/Brxg; outlook not assigned
Company UpdateCredit Rating
S&P Global Ratings assigns RXG bank rating to Yes Bank Ltd; BB+rxg/Brxg; outlook not assigned
RXG assignment and rating details
- S&P Global Ratings assigned bank ratings excluding government support (RXGs) to Yes Bank Ltd.
- Long-term rating: BB+rxg; Short-term rating: Brxg; Outlook: Not applicable; S&P does not assign outlooks to RXGs.
- The RXG designation does not affect the bank's existing issuer credit ratings.
Context of RXG release
- Yes Bank Ltd is listed among seven Indian banks in S&P's RXG announcement for South and Southeast Asia dated 27 November 2026.
- The RXG is a new rating indicating our view of a bank's creditworthiness excluding extraordinary government support.
Issuer communication and next steps
- The Yes Bank letter to BSE/NSE dated 28 November 2026 intimates the RXG ratings and notes the accompanying S&P RXG press release dated 27 November 2026.
Capri Global Capital Limited
Board MeetingOutcome of Board Meeting
Board approves ₹200 crore rights-issue subscription in CGHFL; Capri Global Capital maintains 100% stake
Board MeetingOutcome of Board Meeting
Board approves ₹200 crore rights-issue subscription in CGHFL; Capri Global Capital maintains 100% stake
Main disclosure: board approval and transaction nature
- The Board of Directors of Capri Global Capital Limited approved on November 28, 2026 a proposal to subscribe to equity shares of Capri Global Housing Finance Limited (CGHFL) on a rights basis for an amount not exceeding ₹200 crore.
- CGHFL is a wholly owned subsidiary of the Company, and post-transaction the Company’s shareholding remains 100%.
- The subscription is to be funded in cash through normal banking channels.
- The disclosure is made under Listing Regulations and annexed as Annexure A.
- Board meeting commenced at 12:00 P.M. and concluded at 3:00 P.M.
Rationale and objects
- The investment aims to meet general business requirements, including working-capital support, expansion of business activities and for general corporate purposes.
OthersReg. 34 (1) Annual Report
RCOM reports Rs 9,688 crore total loss for 2025-26 under CIRP; India ops EBITDA negative; assets held for sale
OthersReg. 34 (1) Annual Report
RCOM reports Rs 9,688 crore total loss for 2025-26 under CIRP; India ops EBITDA negative; assets held for sale
Executive summary
- Reliance Communications Limited (RCOM) remains in Corporate Insolvency Resolution Process (CIRP) with the Resolution Professional (RP) Anish Niranjan Nanavaty overseeing the company; related resolutions and plans for the main and subsidiary entities (RCIL, RTL) are under CIRP with some plans approved by NCLT but not yet implemented.
- Financial performance (standalone) shows revenue from operations of Rs 221 crore and total income of Rs 230 crore for the year ended 31 March 2026, with a net loss from continuing operations of Rs 530 crore and a total net loss of Rs 9,688 crore (including Rs 9,158 crore from discontinued operations).
- India Operations segment posted Rs 345 crore of revenue with negative EBITDA of Rs 264 crore and negative EBIT, contributing to the overall consolidated loss; Consolidated EBITDA reported as Rs -159 crore for the year.
- The balance sheet notes ongoing asset monetization and classifications of assets held for sale under Ind AS 105; DoT spectrum-related liabilities and other regulatory actions (SFIO, ED/CBI) have been disclosed, with material uncertainties around going concern acknowledged by auditors.
- Corporate actions and governance during CIRP include AGM arrangements (22nd AGM for 2025-26 scheduled for December 21, 2026 via VC/OAVM with e-voting) and interim measures directing RCC to file extension requests under CIRP constraints.
Consolidated financial snapshot
- Turnover / total income: 346 crore for the year ended March 31, 2026 (Consolidated).
ResultFinancial Results
AF Enterprises Ltd posts unaudited standalone Q3 FY26 results; net loss after tax for quarter Rs 43.67 lakh; revenue from operations Rs 2.79 lakh
ResultFinancial Results
AF Enterprises Ltd posts unaudited standalone Q3 FY26 results; net loss after tax for quarter Rs 43.67 lakh; revenue from operations Rs 2.79 lakh
Standalone quarterly and nine-month results
- Unaudited standalone results for the quarter ended 31 December 2025 approved by the Board on 28 November 2026.
- Revenue from operations: Rs 2.79 lakh; Total income: Rs 2.84 lakh; Profit after tax: Rs -43.67 lakh for the quarter.
- Earnings per equity share (basic and diluted) for the quarter: Rs -0.12.
- Nine months ended 31 December 2025: PAT Rs -138.08 lakh.
- Paid-up equity share capital: Rs 3,389.93 lakh; Reserve excluding Revaluation Reserves: Rs 1,573.98 lakh.
Board MeetingOutcome of Board Meeting
AF Enterprises approves standalone and consolidated quarterly results; consolidated going-concern risk flagged in auditor's report.
Board MeetingOutcome of Board Meeting
AF Enterprises approves standalone and consolidated quarterly results; consolidated going-concern risk flagged in auditor's report.
Board approval of standalone and consolidated financial results
- Board of Directors approved standalone and consolidated financial results for the quarter ended 30 June 2025, the quarter and half-year ended 30 September 2025, the quarter ended 31 December 2025, and the quarter and year ended 31 March 2026, along with the respective Limited Review Reports.
- The approvals were conveyed in a board meeting held on 28 November 2026 and are communicated under Regulation 30 read with Regulation 33 of SEBI Listing Obligations and Disclosure Requirements Regulations, 2015.
- The statements are prepared under Indian Accounting Standards (Ind AS) 34 and SEBI LODR requirements.
Standalone interim results – quarter ended 30 June 2025 (unaudited)
- Independent Auditor's Review Report on the standalone unaudited financial results for the quarter ended 30 June 2025 states the statements were reviewed under SRE 2410 and do not constitute an audit.
- The report concludes there are no material misstatements or undisclosed information as per Regulation 33 of the SEBI LODR Regulations; the review is limited in scope and does not express an audit opinion.
- The June 30, 2025 standalone results show Revenue from Operations of Rs 37.35 Lakhs and Profit after Tax of Rs (48.14) Lakhs, with Basic/Diluted EPS of Rs (0.14).